Overview
Type Commuter rail, Suburban rail, Freight rail, Heavy rail, Rapid transit
System National Rail
London Underground
Status Operational
Locale Greater London
Termini Richmond
Stratford
Stations 23
Services 1
Operation
Opened 1869 (fully)
June 2010 ((Gospel Oak - Stratford re-opened)
2011 (full service resumed)
Closed 2006 (Stratford - North Woolwich)
February 2010 (Gospel Oak - Stratford for engineering works)
Owner Network Rail
Operator(s) London Overground
London Underground (District line)
Depot(s) Willesden TMD
Rolling stock Class 378 Capitalstar
London Underground D78 Stock
London Underground S7 Stock
Technical
No. of tracks 2-4
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 25 kV AC OHLE
750 V DC third rail

The North London Line is a railway line of the London Overground, which passes through the inner suburbs of north London, England. Its route is a rough semicircle from the south west to the north east, avoiding central London. The line is owned and maintained by Network Rail and London Overground.

Although much of it originated as part of the North London Railway, the current route is the result of a series of amalgamations, closures and reopenings; and has a mixed third-rail and overhead electrical power supply. It is an important freight route and is used by the Richmond to Stratford service of the London Overground, as part of the National Rail network.[1] Also between Richmond and Gunnersbury, London Underground's District line shares tracks with London Overground services, although this part is also owned and maintained by Network Rail.

The line closed in February 2010 between Gospel Oak and Stratford for the installation of a new signalling system and the extension of 30 platforms, ultimately to allow four-car trains to run on the London Overground network. The line reopened on 1 June 2010 with a reduced service and none on Sundays,[2] and with the upgrade work completed the full seven-day service resumed on 22 May 2011.

Contents

  • History 1
    • Formation 1.1
    • Developments 1.2
    • Closures 1.3
    • Poor performance before the TFL take over 1.4
    • TfL 1.5
    • Former services 1.6
  • Route 2
    • Track 2.1
    • Traction current supply 2.2
  • Connections 3
    • Interchanges shown on the tube map 3.1
    • Other interchanges 3.2
    • Former interchanges 3.3
  • Current operations 4
    • Rolling stock 4.1
    • Service levels 4.2
    • East London Line extension 4.3
  • Proposed developments 5
    • 5-car operation 5.1
    • Maiden Lane 5.2
    • Crossrail to Hounslow 5.3
    • Old Oak Common 5.4
    • North Acton 5.5
    • High Speed 2 5.6
  • Closed stations 6
    • City Extension 6.1
    • North Woolwich section 6.2
  • References 7
  • Bibliography 8

History

Formation

The North London Line between Richmond and North Woolwich derives from five connecting sections which were opened over 25 years from 1846:

  • The easternmost section opened as the Eastern Counties and Thames Junction Railway in 1846/7 between Stratford and North Woolwich. The later construction of the Royal Victoria Dock necessitated a swing-bridge on the original route south of Canning Town which was rerouted in 1850 via Custom House and the Connaught Tunnel. The original route was retained as the Silvertown Tramway, a local freight line connected at both ends to the new main line.
  • The main central section opened from 1850 to 1852 as the East & West India Docks & Birmingham Junction Railway (renamed the North London Railway (NLR) in 1853). This gave a link from the Euston main line near Primrose Hill to the docks at Poplar via Bow.
  • In the west, the North & South Western Junction Railway was opened in 1853 from Willesden Junction to a junction with the Hounslow Loop Line near Kew Bridge.
  • The last link in the east was opened between the NLR near Victoria Park and Stratford in 1854.
  • To obviate NLR trains running on the busy Euston main line, the Hampstead Junction Railway was opened from the NLR at Camden Road to Willesden via Hampstead Heath in 1860.
  • To give the NLR direct access to the City of London the City Extension to Broad Street was opened from Dalston Junction in 1865.
  • The final part of the route was the opening of a link from South Acton to Richmond by the London & South Western Railway (LSWR) in 1869.

Developments

The line between Broad Street and both Kew Bridge and Richmond was electrified by the LNWR in 1916 on the 4th rail DC system.

In 1944 passenger service on the NLR Poplar branch ceased. Freight traffic continued on the branch until the docks on the Isle of Dogs until 1980. The trackbed of the southern part of the branch, from Poplar to Bow, was used for the Docklands Light Railway (DLR) branch to Stratford.

The service was listed for closure in the 1963 Beeching Report, with losses claimed as being £69,000 per year - £1.1 million in today's money. It was saved after a huge campaign. The line was Grant Aided under the 1986 Transport Act and was under threat when the Conservative Government of 1970-71 proposed to reduce Grant Aid funding. That threat - eventually removed - led to the founding of a new campaign group, the North London Line Committee which tried to work with British Rail management to promote the service.

In 1979 the North Woolwich to Stratford service was extended to Camden Road as the CrossTown LinkLine service using the same Cravens-built diesel multiple unit trains. There were no intermediate stations until in 1980 Hackney Wick, near the site of the former Victoria Park station, opened and Hackney Central re-opened, Homerton re-opened in 1985 (both those stations had closed in 1944). New platforms were built at West Ham for interchange with the adjacent Underground station.

Closures

In the 1980s Broad Street station closed and the Tottenham Hale–Stratford link and the station at Lea Bridge ceased to be used by regular passenger trains. The line between Dalston and North Woolwich was electrified on the third-rail system and Broad Street services were diverted to North Woolwich using former Southern Region 2-EPB types built in the 1950s. The two-car trains soon proved too small and were replaced by three-car Class 313 electric multiple units. The new service was branded by British Rail as the North London Link, and some signs using this name still exist.

In December 2006, as with the Poplar branch (see above), the line between Stratford and North Woolwich was permanently closed to make a way for a future DLR extension from Crossrail's branch to Abbey Wood (opening 2018). The section south of Stratford had always been the Cinderella end of the line, when there were operating problems it was common for trains to be turned short at Stratford.

Poor performance before the TFL take over

Despite published performance figures[3] the North London Line used to be regarded by frequent travellers as offering a poor service,[4] with extremely congested trains and an unreliable service[5] with trains often cancelled shortly before they are due to arrive. A 2006 London Assembly report described the current service as "shabby, unreliable, unsafe and overcrowded", proposing the transfer of the service to Transport for London (TfL) as a solution to improve the quality of the service[6] due to upgrade plans[7] which coincided with the extension of the East London line. A report on the line can be found on the London Assembly website.[8]

TfL

The North London Line, as part of Silverlink, along with the West London Line, Gospel Oak to Barking Line and the Watford DC Line, was transferred to Transport for London (TfL) in 2007 to form its new London Overground service. TfL began to remodel stations, integrate lines and following the transfer and extension of the East London Line, aims to create an orbital rail service. TfL also brought in new trains and the line, which previously appeared on tube maps following a public campaign, gained its own colour. TfL extensively refurbished and upgraded the line.

Former services

In addition to the primary Broad Street - Richmond service there were services that linked Broad Street with Harrow & Wealdstone and Watford Junction on the West Coast Main Line. Most of these were routed via the line between South Hampstead and Camden Road, calling at Primrose Hill, although some travelled via Hampstead Heath and switched to the Watford line at Willesden Junction. By the time that Broad Street closed in 1986 the Watford services operated only in the rush hours, and they were diverted to Liverpool Street by way of a new link in Hackney, known as the Graham Road Curve. Trains were frequently cancelled as British Rail management needed to prioritise other services, and this led to falling patronage. British Rail applied to close the service in 1990 and the last trains ran wo years later.

In 2000, Anglia Railways started a service between Basingstoke and Ipswich, utilising parts of the North London Line. The service was called London Crosslink and ran up to five times a day at roughly two-hourly intervals. The service called only at principal stations such as Staines, Feltham and Brentford. On the North London Line, the trains called only at Stratford, Highbury & Islington, Camden Road (some services), West Hampstead and Willesden Junction. The service was withdrawn in 2002.

The AC electrification of the eastern part of the North London Line uses the previously unelectrified northern pair of tracks, which were also partially singled at the same time. Between London King's Cross stations, this link has only been used for freight trains. It too was singled concurrent with the AC electrification of the eastern part of the North London Line.

Route

Geographical map of the North London Line

Track

Most of the line runs in a curve across north London. Only Richmond and Kew Gardens stations at the western end are south of the River Thames. The river crossing is made by Kew Railway Bridge on tracks which are shared with the London Underground District line. The location of the eastern extremity has varied over the years. Between 1944 and 1986 it was at Broad Street station, then it switched to North Woolwich. It was cut back to Stratford. A tunnel, the Hampstead Heath tunnel, runs under Hampstead between Finchley Road & Frognal and Hampstead Heath. The line is double track throughout with a mix of triple and quadruple track between Camden Road and Dalston Kingsland. The former North Woolwich branch included a section of single track between Custom House and North Woolwich stations, and the Broad Street branch was at one time formed of quadruple track.

During the February–May 2010 bloackade, the Caledonian Road & Barnsbury, Highbury & Islington and Canonbury stations were rebuilt to allow the extended East London line to serve Highbury & Islington on fully segregated tracks on the south side of the cutting. Under the reinstated four-track arrangement, the North London line moved to the north side of the cutting between Dalston Kingsland and Highbury and Islington, before switching to the inner pair of tracks towards the former Maiden Lane station, leaving the outer pair for freight use only.

Traction current supply

The line is electrified using the third rail system from Richmond to Acton Central. Overhead lines are used from Acton Central to Stratford. The line to Broad Street used third rail supply and when the through service to North Woolwich started in 1985 trains used the third rail throughout. When the trains were replaced a few years later by dual-voltage Class 313 trains it became possible to use the overhead line equipment which had been added to parts of the line for the benefit of freight trains. There had been some unexpected difficulties with earth currents from the third rail system which this overcame. This use was steadily extended and trains had to make a number of changes between traction current supplies during their short journey. These were at Dalston Kingsland, Camden Road and Acton Central. With the final upgrade of the line between Camden Road and Stratford, the need to change traction current systems on this stretch was eliminated, and now the only changeover takes place at Acton Central.

Connections

The line crosses or comes into contact with a very large number of railway lines, especially lines radiating from central London. This does provide opportunities to move between separate sectors of suburban London without having to enter the central zone.

Interchanges shown on the tube map

Other interchanges

Former interchanges

  • at North Woolwich passengers could cross the Thames via the Woolwich foot tunnel or the free ferry to Woolwich Arsenal station for connections on the North Kent line to Medway Towns, Gravesend, Dartford, Sidcup, Abbey Wood, Blackheath, Lewisham, Greenwich and Central London

Current operations

Rolling stock

Old vs new: a Class 313 and its replacement, a Class 378 Capitalstar at Richmond

London Overground uses Class 378 Capitalstar four-car dual-voltage electric trains, compatible with both 750 V DC third-rail and 25 kV AC overhead power sources,[9] The Class 378 Capitalstars replaced the Class 313 trains, which were withdrawn from the route by February 2010.

Service levels

Trains run seven days a week day from approximately 06:00 (09:00 Sundays) until 23:30. During peak times, there are four trains per hour between Richmond and Stratford; and four trains per hour operate between Clapham Junction and Stratford on the West London Line service, making up a total of eight trains per hour between Willesden Junction and Stratford. During off-peak times, there are four trains per hour between Richmond and Stratford, and four trains per hour on the West London line between Clapham Junction and Willesden Junction, with two of these per hour continuing to Stratford, making up a total of six trains per hour between Willesden Junction and Stratford.

The introduction of the new four-car, air-conditioned trains, combined with improved signalling and passenger information has dramatically overhauled the service, making it a very effective alternative to travelling through central London for many orbital journeys.

East London Line extension

From March 2011, the extended East London Line connects to the NLL with ELL services joining the line west of Dalston Kingsland, running to Highbury & Islington.,[10][11]

Map of the London Overground network, with the NLL connected to other lines

Proposed developments

5-car operation

Transport for London has extended platforms at some stations along the route to prepare the line for 5-car operation in 2015. This project aims to combat overcrowding on the line. The first 5-car trains started in Summer 2015

Maiden Lane

Maiden Lane station may be reopened by Camden Council[12] however the Office of Rail Regulation has not included this in the current plans.[13]

Crossrail to Hounslow

Hounslow council proposed that part of the North London Line be used as a branch of Crossrail to Hounslow.[14] This would see Crossrail services stopping at Acton Central and South Acton. However it was not included in the initial Crossrail bill, but could potentially form part of a later extension.

Old Oak Common

Under the former government's plans for High Speed 2 line from London Euston to Birmingham; a new station called Old Oak Common would be built by 2025 serving the North London Line, West London Line, High Speed 2 and Crossrail. The new government does support this after opposing it at first.[15]

North Acton

Another new station at North Acton is proposed for interchange with the Central line. As this may require the central line station being moved to the east, it is merely an aspiration.

High Speed 2

The planned link between the proposed High Speed 2 line and the existing High Speed 1 line would have used the North London Line alignment around Camden Road station which may have reduced the existing or future capacity of the line. Due to its heavy investment in the line and the passenger growth on it, Transport for London is against the alignment's use as a link between the two High Speed lines.[16] This link has now been removed from the parliamentary bill.

Closed stations

Silverlink Metro 313117 at North Woolwich on 9 December 2006, the final day of service at that station

Closed stations apart from those on the closed sections of the line are:

City Extension

On 1 November 1865 the NLR opened its City Extension mostly on a viaduct from a triangular junction at Dalston to Broad Street in the City with these stations:

The extension closed on 30 June 1986, but although the track was lifted the viaduct remained in place. In 2010, the route was re-opened as part of the extended East London Line, which, like the North London Line, is operated by London Overground.

North Woolwich section

On 10 December 2006, the former Eastern Counties and Thames Junction Railway line between Stratford and North Woolwich was closed to allow building between Stratford and Canning Town of a Docklands Light Railway line to Stratford International. Part of the south end of closed section is to be used for Crossrail.[17]

NLL stations closed were:

DLR and Jubilee line services are not affected at the first three of those stations.

The DLR line to Stratford International uses the former NLL low level platforms at Stratford. NLL trains now terminate at new platforms on the north side of the high level station.

References

  1. ^ "Route 6 - North London Line and Thameside : 2009 Route Plan" (PDF).  
  2. ^ "London Overground to close from Gospel Oak to Stratford as part of £326m upgrade to deliver longer, more frequent trains". TfL. 18 December 2009. Archived from the original on April 25, 2010. Retrieved 6 February 2010. 
  3. ^ "Silverlink rises to second position in the national performance league". 2006-09-18. Retrieved 2007-10-26.  Association of Train Operating Companies [2] Press Releases
  4. ^ Sharp, Rachel (2007-10-24). "TfL to take on rail network". Ealing Times. Retrieved 2007-10-26. 
  5. ^ "Braced for rail strikes". Hackney Gazette. 2007-10-26. Retrieved 2007-10-26. 
  6. ^ London Assembly - Light at end of the tunnel for London's forgotten railway
  7. ^ Always Touch Out - London Overground & Orbirail
  8. ^ London's forgotten railway (PDF)
  9. ^ Transport for London - £36m contract to bring extra rail carriages for London Overground
  10. ^ Transport for London - East London Railway project
  11. ^ Dalston Junction to Highbury & Islington now Connected
  12. ^ King's Cross Development plan (PDF)
  13. ^ "Sections 17/18 - Section 17 and 18 - new track access contracts : Office of Rail Regulation". Rail-reg.gov.uk. Retrieved 2010-06-22. 
  14. ^ "A4" (PDF). Retrieved 2010-06-22. 
  15. ^ No business case' to divert HS2 via Heathrow, say Mawhinney Page 6-7, Rail Magazine, Issue 649, 28 July to 10 August 2010
  16. ^ Transport Select Committee, 28 June 2011, House of Commons
  17. ^ Transport for London - Stratford International Extension

Bibliography

  • Wayne Asher. 2015. A very Political Railway - the rescue of the North London Line. ISBN 978-1-85414-378-5
  • HP White. 1971. A Regional History of the Railways of Great Britain, Volume 3 - Greater London. ISBN 0-7153-5337-3
This article was sourced from Creative Commons Attribution-ShareAlike License; additional terms may apply. World Heritage Encyclopedia content is assembled from numerous content providers, Open Access Publishing, and in compliance with The Fair Access to Science and Technology Research Act (FASTR), Wikimedia Foundation, Inc., Public Library of Science, The Encyclopedia of Life, Open Book Publishers (OBP), PubMed, U.S. National Library of Medicine, National Center for Biotechnology Information, U.S. National Library of Medicine, National Institutes of Health (NIH), U.S. Department of Health & Human Services, and USA.gov, which sources content from all federal, state, local, tribal, and territorial government publication portals (.gov, .mil, .edu). Funding for USA.gov and content contributors is made possible from the U.S. Congress, E-Government Act of 2002.
 
Crowd sourced content that is contributed to World Heritage Encyclopedia is peer reviewed and edited by our editorial staff to ensure quality scholarly research articles.
 
By using this site, you agree to the Terms of Use and Privacy Policy. World Heritage Encyclopedia™ is a registered trademark of the World Public Library Association, a non-profit organization.
 


Copyright © World Library Foundation. All rights reserved. eBooks from Project Gutenberg are sponsored by the World Library Foundation,
a 501c(4) Member's Support Non-Profit Organization, and is NOT affiliated with any governmental agency or department.