Location
Country Bulgaria
Republic of Macedonia
Albania
General direction east-west
From Burgas
To Vlorë
General information
Type Oil
Operator Albanian Macedonian Bulgarian Oil Corporation
Technical information
Length 912 km (567 mi)
Maximum discharge 750,000 barrels per day (119,000 m3/d)

AMBO pipeline is a planned oil pipeline from the Bulgarian Black Sea port of Burgas via the Republic of Macedonia to the Albanian Adriatic port of Vlorë.

Contents

  • History 1
  • Description 2
  • Project company 3
  • Alternative projects 4
  • See also 5
  • References 6

History

The pipeline was proposed already in 1993. On 27 December 2004, prime-ministers of Albania, the Republic of Macedonia and Bulgaria signed the latest political declaration, followed by the memorandum of understanding between representatives of Albania, the Republic of Macedonia and Bulgaria and Ted Ferguson, the president and CEO of AMBO.[1] On 30 October 2006, Albania and the Republic of Macedonia signed a protocol to determinate the entrance points of the pipeline. The entrance point will be Stebleve village in Albania and Lakaica village in the Republic of Macedonia. A similar protocol between Bulgaria and the Republic of Macedonia was signed later in 2006.

On 31 January 2007, the Republic of Macedonia, Bulgaria and Albania signed a trilateral convention on the construction of the Balkan pipeline AMBO. This document has been ratified by the Parliaments of all three countries and governs the construction, operation, and maintenance of the pipelines.[2]

Description

The aim of the 912-kilometre (567 mi) long pipeline is to bypass the Turkish Straits in transportation of Russian and Caspian oil. The pipeline is expected to cost about US$1.5 billion and it will have a capacity of 750,000 barrels per day (119,000 m3/d).[3] There will be four pump stations, two in Bulgaria and one each in the Republic of Macedonia and Albania, constructed along the route. A pre-front-end engineering and design study (FEED) will be prepared by KBR.

Environmental studies to be conducted and construction licenses need to be obtained. The pipeline was expected to be operational by 2011; however, as of December 2011 construction has not started.[4]

Project company

The pipeline is planned to be built and operated by the US-registered Albanian Macedonian Bulgarian Oil Corporation (AMBO). The project is backed by the US government, who financed a feasibility study of pipeline.[5]

Alternative projects

Other pipeline projects (which do not compete with AMBO since they serve different markets) are the Burgas-Alexandroupoli pipeline from Burgas to the Greek Aegean port Alexandroupoli, and the Pan-European Pipeline from Constanţa in Romania to Trieste in Italy. There is also the Baku-Tbilisi-Ceyhan pipeline. Compared with Burgas-Alexandroupoli pipeline, the AMBO pipeline is longer and more expensive, but Vlorë (which is a sheltered, deep-water, all-weather port) could accommodate larger tankers and is more accessible than Alexandroupoli. Also, an oil spill in the Aegean would have a negative influence on Greece’s tourism industry.[6]

See also

References

  1. ^ "Go-ahead for Balkan oil pipeline".  
  2. ^ Marina Stojanovska (2007-02-14). "AMBO pipeline deal clears another hurdle". Southeast European Times. Retrieved 2008-04-05. 
  3. ^ Barry Wood (2004-12-30). "Balkan Oil Pipeline Agreement Moves Project Closer to Reality". Voice of America. Retrieved 2008-04-05. 
  4. ^ Granitsas, Alkman (2007-04-26). "Official: Trans-Balkan Pipeline to Begin Ops by 2011". Downstream Today.  
  5. ^ "AMBO Pipeline Moves Forward: Interview with Gligor Tashkovich". Balkananalysis.com. 2005-01-09. Retrieved 2008-04-05. 
  6. ^ "AMBO Trans-Balkan Pipeline Agreement Finally Signed". Balkananalysis.com. 2004-12-29. Retrieved 2008-04-05. 
This article was sourced from Creative Commons Attribution-ShareAlike License; additional terms may apply. World Heritage Encyclopedia content is assembled from numerous content providers, Open Access Publishing, and in compliance with The Fair Access to Science and Technology Research Act (FASTR), Wikimedia Foundation, Inc., Public Library of Science, The Encyclopedia of Life, Open Book Publishers (OBP), PubMed, U.S. National Library of Medicine, National Center for Biotechnology Information, U.S. National Library of Medicine, National Institutes of Health (NIH), U.S. Department of Health & Human Services, and USA.gov, which sources content from all federal, state, local, tribal, and territorial government publication portals (.gov, .mil, .edu). Funding for USA.gov and content contributors is made possible from the U.S. Congress, E-Government Act of 2002.
 
Crowd sourced content that is contributed to World Heritage Encyclopedia is peer reviewed and edited by our editorial staff to ensure quality scholarly research articles.
 
By using this site, you agree to the Terms of Use and Privacy Policy. World Heritage Encyclopedia™ is a registered trademark of the World Public Library Association, a non-profit organization.
 


Copyright © World Library Foundation. All rights reserved. eBooks from Project Gutenberg are sponsored by the World Library Foundation,
a 501c(4) Member's Support Non-Profit Organization, and is NOT affiliated with any governmental agency or department.